Cost for 1000 H100s in Texas for 30 days at 80%?
For 1000 H100 GPUs in Texas (ERCOT) running at 80% utilization for 30 days:
💰 **Total Cost**: $181,440
⚡ **Energy Usage**: 2,016 MWh
🌱 **CO₂ Emissions**: 907 kg
📊 **Peak Demand**: 560 kW
This assumes $0.09/kWh pricing and 0.45 kg CO₂/kWh carbon intensity for the ERCOT grid.